Google / YouTube
Studio 3 was installed in a separate 12 day phase to meet the Main Contractor’s handover date for the section of the building in which the studio is located. Studios 1 and 2 were combined and completed simultaneously within a second 12 day phase. The concrete floor had been laid to -6/+6 30 mm below […]