Warehouse Conversion

Posted by on Mar 26, 2018 in Featured, Portfolio | 0 comments

Facts & Figures Completion date: March 2018 Location: UK Size of floor: 600 sq m Requirement There were two sections to the floor: An area which was in a poor condition and another which was satisfactory. The old and worn section was comprised of a number of uneven slabs. The floor was also heavily soiled and had a raised area of quarry tiles. The aim was to convert the area into a new assembly facility. In order to provide a fully...

Read More

Installation at Oriens Aviation

Posted by on Feb 22, 2018 in Featured, Portfolio | 0 comments

Facts & Figures Completion date: February 2018 Location: Biggin Hill, Kent Size of floor: 1300 sq m Condition of Existing Floor A concrete floor which had been coated in the past and was in need of a re-coat and repair work. Colour Light Grey with fine slip resistant finish. We installed a 1m wide, coarse, slip-resistant strip behind the hangar doors as an additional safety feature. Preparation The floor was prepared using Diamond Floor...

Read More

Refurbishment at Technicut

Posted by on Dec 6, 2017 in Featured, Portfolio | 0 comments

Facts & Figures Completion date: November 2017 Location: Sheffield Size of floor: 1000 sq m Condition of Existing Floor A concrete floor which had been coated by Elgood Flooring over 9 years ago. The coating had been a great success and for this reason Technicut were keen to employ Elgood Industrial Flooring again to refurbish the floor in readiness for the arrival of their new machinery. The excellent adhesion of our coating system to the...

Read More

Akzo Nobel Premier Whites

Posted by on Oct 11, 2017 in Featured, Portfolio | 0 comments

Facts & Figures Completion date: September 2017 Location: Stowmarket, Suffolk Size of floor: 1600 sq m Condition of existing floors: The concrete was worn and pitted. Defective patches were removed and repaired. Colour Charcoal with Yellow markings. Brilliant Red was used to highlight the incline into the bunded area. Special Requirements Pallet Lane markings had to be reinstated with each phase. Preparation The concrete was prepared using...

Read More

Mecmesin

Posted by on Sep 5, 2017 in Featured, Portfolio | 0 comments

Facts & Figures Completion date: August 2017 Location: Slinfold, Sussex Size of floor: 80 sq m Mecmesin’s Required A floor suitable for Forklift and pallet truck movement. Mecmesin selected Elgood Industrial Flooring’s Britdura 750 High-build solvent free Epoxy Floor Coating. The floor has a built in fine slip resistant texture which is not sprinkled by hand and as such does not inhibit sweeping / house keeping. Special Requirements The...

Read More

BBC Studioworks, Television Centre, Studio TC1

Posted by on Sep 2, 2017 in Featured, Portfolio | 0 comments

Background: BBC Studioworks have returned to three studios at the historic Television Centre. The studio floors were over 20 years old and required refurbishing. The floor in Studio TC1 had been used for the storage of construction equipment and materials and required a refurbishment to return it to its former glory. Facts & Figures Completion date: July 2017 Location: TC1 – The largest Television Studio at Television Centre Size of...

Read More

BBC Studioworks, Television Centre, Studio TC3

Posted by on Sep 2, 2017 in Featured, Portfolio | 0 comments

Background: BBC Studioworks have returned to three studios at the historic Television Centre. The studio floors were over 20 years old and required refurbishing. The floor in Studio TC3 had suffered extensive damage from the ingress of water over the last few years. The decision was made to remove the operating surface of 6mm from the underlying screed, to repair as necessary and resurface. Facts & Figures Completion date: June 2017...

Read More

BBC Television Centre Scenery Runway

Posted by on May 15, 2017 in Featured, Portfolio | 0 comments

Background: The BBC are returning to the historic Television Centre. The studio floors and service areas required refurbishing ahead of the re-launch of broadcasting from the three studios. Facts & Figures Completion date: April 2017 Location: BBC Television Centre, London Size of floor: 175 sq m Installation Programme: 2 weeks Sub Floor: A rough concrete from which a 25mm asphalt floor had been removed. Specification Pre-blended fast...

Read More

TV3 Television Network

Posted by on Jan 7, 2017 in Featured, Portfolio | 0 comments

Background: TV3 are upgrading their facilities with Studio 1 set to become their first full high definition studio. This presented them with their first opportunity in 18 years to improve and refurbish their floor. TV3 had a sub-floor that had been laid suitably level for us to be able to offer our 6mm operating surface as an economical alternative to the full Elgood Universal Television Studio Floor. Facts & Figures Completion date: December...

Read More

Google & YouTube Studios

Posted by on Jul 22, 2016 in Featured, Portfolio | 0 comments

Background: We were recommended by a Broadcasting advisor namely Wave Science Technology to install the studio floors in Google’s new Kings Cross, London UK Head Office. The studios are to be used by YouTube and the main contractor was ISG. Installation Programme: Studio 3 was installed in a separate 12 day phase to meet the Main Contractor’s handover date for the section of the building in which the studio is located. Studios 1 and 2 were...

Read More