The Hospital Club

Posted by on Jan 29, 2019 in Featured, Portfolio | 0 comments

The Hospital Club have had our Television Studio Floor for 18 years. Uniquely, the floor has a matt finish which has been refreshed every 12 – 18 months to maintain its appearance. The popular studio has a busy life and following wear and tear over the years, the decision was made to refurbish the floor in black. Facts & Figures Title: The Hospital Club Completion date: January 2019 Location: Covent Garden, London Area: 250 sq m...

Read More

Chinese State TV CGTN Studios European Hub

Posted by on Nov 12, 2018 in Featured, Portfolio | 0 comments

This was a fast track installation with a tight time frame which involved working two shifts most days. The floors were installed by our in-house team of trained operatives. Facts & Figures Title: Chinese State TV CGTN Studios European Hub Completion date: November 2018 Location: Chiswick, London Area: Studio A and Studio B, a total of 285 sq m ProgrammeThis was a fast track installation with a tight time frame which involved working two...

Read More

Financial Times Studio Floor

Posted by on Oct 1, 2018 in Blog, Featured, Portfolio | 0 comments

Having been recommended by a broadcasting consultant , we were employed by McLaren to install the television studio floor for the Financial Times at New Bracken House in London. Facts & Figures Title: Financial Times Studio Floor Completion date: September 2018 Location: Friday Street, London Area: 120 sq m Background Having been recommended by a broadcasting consultant , we were employed by McLaren to install the television studio floor...

Read More

Industrial Flooring Refurbishment

Posted by on Oct 1, 2018 in Featured, Portfolio | 0 comments

Our client was converting the industrial area to a new use. Having stripped out old plant, the decision was made to refurbish the damaged and soiled floor prior to the installation of racking. Facts & Figures Title: Industrial Flooring Refurbishment Completion date: August 2018 Location: Derby Area: 1200 sq m Programme: 5 days Requirement Our client was converting the industrial area to a new use. Having stripped out old plant, the decision...

Read More

BT Sport

Posted by on Jul 17, 2018 in Featured, Portfolio | 0 comments

A challenging installation to replace half of a floor to a strict deadline. Half of Studio 1 had a conventional floor and half had a glass floor. The glass floor had limitations and a decision was made to replace this half of the floor with a fully functional studio floor. With new productions coming to the studio, BT Sport required a studio floor to meet the forth coming camera tracking and loading demands. Facts & Figures Title: Timeline...

Read More