Condition of Floors: old and heavily worn concrete

The work was carried over 1- 2 years on an as and when basis. A square metre rate was established for an agreed minimum size of area for any one phase. Typically, the phases were carried out over shut downs, Monday to Friday, weekends and in between improvements to the fabric of the building.

As part of the large investment programme in the Nottingham Road UK manufacturing site, Hepworth wished to upgrade the appearance of the floor cost effectively. In total, the floors measured over 15,000 square metres.

Facts & Figures
Needs
Preparation
Floor
Get Started Find out more about our professional floors – or get a quick quote today