European Spring & Pressings Ltd

Posted by on Sep 2, 2011 in Portfolio | 0 comments

Installation Programme: one phase with a duration of three days over a weekend. Flooring selected: Elgood Industrial Flooring’s Britdura 2000 Solvent Free Epoxy Floor Flow Coat in the colours Slate Grey and Cherry Red. Supply Direct Alternative: the Cornwall division of European Springs purchase our Solvent Free Epoxy Floor Coating to paint small areas on an as and when basis. Our Solvent Free Epoxy Floor Coating for DIY use is normally...

Read More

KIM Systems

Posted by on Jan 2, 2011 in Portfolio | 0 comments

Installation Programme: a single phase of three days. KIM Systems employed ​Elgood Industrial Flooring directly in order to ensure that their choice of flooring was installed. Existing floors: a new concrete floor in a satisfactory condition. The Elgood Service: manufactured, prepared and installed entirely by Elgood Industrial Flooring. Facts & Figures Location: Cambridgeshire Completion date: May 2012 Size of floor: Approximately 200 sqm...

Read More

Servisair LTD

Posted by on Aug 2, 2007 in Portfolio | 0 comments

Installation Programme: two phases each with a duration of three days. The installation had to be completed with minimum disruption to ongoing services during the height of the holiday season. Condition Of Floor: the concrete floor was heavily soiled and had a rough tamped finish. Facts & Figures Completion date: August 2007 Size of floor: 600 sqm Product: Britdura 2000 Needs The wide expansion joints had recessed and had become a hazard to...

Read More

HYUNDAI UK LTD, TILBURY DOCKS

Posted by on Jul 2, 2006 in Portfolio | 0 comments

Condition of Floors: 850 square metre old heavily worn and painted concrete floor. The installation was completed in three days and one night including all line markings. Hyundai selected the Elgood Industrial Flooring’s Britdura 750 Solvent Free Highbuild Epoxy Floor Coating for the Fitting Bays and our Britdura 2000 Solvent Free Flow Coat for the Drive Way. Facts & Figures Completion date: July 2006 Size of floor: 850 sqm Product:...

Read More

SMALL & TIDMAS, BODMIN, CORNWALL

Posted by on Jan 2, 2003 in Portfolio | 0 comments

Condition of Floors: the concrete had historically been substandard and soft. The heavy loads and constant 24 hour pedestrian traffic had aggravated this problem resulting in the concrete losing its original surface finish, leaving the aggregate exposed. Dust and the tired appearance that the floor lent the building were also of concern. The installation was planned to be completed in a set number of phases over a period of roughly four years....

Read More