Home » Case Studies » BBC Studioworks, Television Centre TC3

BBC Studioworks, Television Centre TC3

BBC Studioworks have returned to three studios at the historic Television Centre. The studio floors were over 20 years old and required refurbishing. The 700 sq m floor in Studio TC3 had suffered extensive damage from the ingress of water over the last few years. The decision was made to remove the operating surface of 6mm from the underlying screed, to repair as necessary and resurface.

The floor top was removed using a ride on stripping machine and the screed was prepared using a combination of methods.

The BBC Television Centre is at the heart of a larger Construction Site so it was important that we had SMSTS and SSSTS qualified staff. To unload deliveries we had our own CPCS qualified Forklift Driver.

We were selected by BBC and employed direct.

We have had and association with Television Centre for over 50 years and are    proud to have been given the opportunity to continue this in 2017 as the BBC return to the site.

The installation was completed ahead of schedule by our small team of full time employees.

Background: BBC Studioworks have returned to three studios at the historic Television Centre. The studio floors were over 20 years old and required refurbishing. The floor in Studio TC3 had suffered extensive damage from the ingress of water over the last few years. The decision was made to remove the operating surface of 6mm from the underlying screed, to repair as necessary and resurface.

Facts & Figures
  • Completion date: June 2017
  • Location: BBC Television Centre Studio 3
  • Size of floor: 700 sq m
Background
BBC Studioworks have returned to three studios at the historic Television Centre. The studio floors were over 20 years old and required refurbishing. The floor in Studio TC3 had suffered extensive damage from the ingress of water over the last few years. The decision was made to remove the operating surface of 6mm from the underlying screed, to repair as necessary and resurface.
Specification
The Elgood Universal Studio Floor Operating surface.
Qualifications
The BBC Television Centre is at the heart of a larger Construction Site so it was important that we had SMSTS and SSSTS qualified staff. To unload deliveries we had our own CPCS qualified Forklift Driver.
Preparation
The floor was removed using a ride on stripping machine and the screed was prepared using a combination of methods.
On Time
We were selected by BBC and employed direct.

We have had and association with Television Centre for over 50 years and are proud to have been given the opportunity to continue this in 2017 as the BBC return to the site.

The installation was completed ahead of schedule by our small team of full time employees.

Buy with Confidence
Truly Single Source. The systems are designed, manufactured and installed by Elgood Industrial Flooring Ltd to meet the exacting criteria demanded by broadcasters.

This post was originally published on our sister site, Television Studio Floors.

Find out more about our professional floors – or get a quick quote today
Get Started