CUMMINS DIESEL LTD, THURROCK, ESSEX

Condition of Floors: existing concrete floors with a weak surface. Two phases were required to minimise disruption to servicing. Cummins Diesel chose Elgood Industrial Flooring following a successful installation at their Iver depot. The floor was being upgraded as part of an investment programme in Cummin’s properties and to improve house keeping. […]

Read More… from CUMMINS DIESEL LTD, THURROCK, ESSEX

CUMMINS DIESEL LTD, IVER

Condition of Floor: New power floated concrete floor. A five day installation was required to install the floor whilst working alongside other contractors. Cummins Diesel independently chose Elgood Industrial Flooring to work in their newly acquired unit in Iver. The flooring formed part of the fit out for a relocation and upgrade programme that Cummins […]

Read More… from CUMMINS DIESEL LTD, IVER

SWIFTFLOW / GVA GRIMLEY

The photographs were taken at the Swiftflow Distribution Centre in Highams Park, Walthamstow. This was one of two Distribution Centres operating in the South East of England to supply C & A High Street Stores. As a result of C & A having to cease trading in 2000, they were left with distribution centres of […]

Read More… from SWIFTFLOW / GVA GRIMLEY

SMALL & TIDMAS, BODMIN, CORNWALL

Condition of Floors: the concrete had historically been substandard and soft. The heavy loads and constant 24 hour pedestrian traffic had aggravated this problem resulting in the concrete losing its original surface finish, leaving the aggregate exposed. Dust and the tired appearance that the floor lent the building were also of concern. The installation was […]

Read More… from SMALL & TIDMAS, BODMIN, CORNWALL