SHARPS BEDROOMS, WOLVERHAMPTON

Back to Case Studies

Completion date:

April 2002

Condition of Floors

Sharps Bedrooms acquired a new storage warehouse earlier in the year. The warehouse had a power floated concrete floor and had been fitted with high storage racking.

Installation Programme

Approximately 800 lineal metres of lines were laid over three days.

Sharps Required

The racking was to receive palletised loads from reach trucks and for the safety of the workforce pedestrian walkways had to be installed.

Instead of having solid gangways installed, Sharps Bedrooms decided to have our Permanent Epoxy line markings laid. The photographs show the finished lines. The line markings have a longevity and appearance far superior to spray painted lines.

Preparation

The concrete had to be lightly keyed to prevent the lines from coming away from the smooth surface finish. We prepared the concrete by using a shotblaster equipped with a reducer to abrade the floor to a width of 4".

Click Images to View Enlargements
Sharps Bedrooms, WolverhamptonSharps Bedrooms, Wolverhampton

Elgood Industrial Flooring - Call us FREE on 0800 393 779

© 2007 Elgood Industrial Flooring Ltd.

Valid XHTML 1.0 Strict