Completion date:August 2000 Condition of FloorsWorn and exposed concrete. Installation ProgrammeThe installation was carried out in three phases including two weekends so as not to disrupt production. RequirementsThe aim was to find a cost effective way to upgrade the appearance of the floors. It was important that the floor sealed the worn and dusting surface and provide a hard wearing working surface. PreparationA combination of shotblasting and diamond grinding were used to prepare the floor. All preparation methods being dust controlled. The Chosen FloorThe Britdura 750 Epoxy Floor Coating which is laid to a thickness of 1mm. |