BBC TC8 TELEVISION STUDIO REFIRBISHMENT |
Back to Case Studies |
Completion date:June 2003 Condition of FloorsIn a satisfactory condition apart from some areas of damage. The studio measured approximately 650 sq m. Installation ProgrammeThe work was carried out in normal working hours whilst broadcasting continued in adjacent studios. BBC SelectedThe Elgood Television Studio Floor Top System. BBC RequiredA level high performance television studio floor to meet their exacting camera tracking specification. PreparationMechanical removal of the operating surface. The sub floor was then reinforced and the operating surface was renewed. The Chosen FloorThe Television floor was laid in the colour TV Grey with a static disspative finish incorporated into the finish. Numerals were applied and a reference grid was engraved into the surface. |