To find out how much of a specific product you require for your project, please complete the simple questions below (NB. Our minimum order quantity is £100).
We can manufacture and deliver large quantities of industrial floor paint in a range of stock colours within 48 to 72 hours of an order being placed.
Please note that cleaning products are dilutable.
Cleaning should be repeated as necessary.
The coverage rates produced are given as a guide: in practice, the texture and porosity of the concrete will produce varying coverage. Floor cleaner rates will depend on the degree of contamination.
Epoxy Coating - Instructions
PREPARATION
- The floor should be clean and sound. Contamination such as dirt, dust, oil etc must be removed before coating the floor.
- Epoxy coatings adhere best to a lightly textured surface, this is best achieved by shotblasting the floor. Shotblasting need not create dust and is a cost effective method of preparation. We can arrange this service for you. The heavier the traffic, the more important it is to shotblast the floor.
- If you do not shotblast the floor always paint a trial area to prove your preparation is adequate and that the epoxy coating is well adhered to the concrete.
MIXING
- Always mix complete units. The ratio of resin to hardener is critical. Mix with an electric drill fitted with a mixing paddle.
- Mix one unit at a time as the 'pot life' of the mixture is only 15 minutes. Mix thoroughly, use immediately.
SLIP RESISTANT
- Whilst drill mixing add one to two cups of Elgood Grit 70 to produce a lightly textured surface.
PAINTING
- Pour the mix into a paint tray and apply using a long-handled roller.
- Two coat applications are best. The second coat should be applied 12 to 24 hours after the first coat.
- The floor should be ready for light traffic in 12 to 24 hours and normal traffic in 24 to 36 hours.
Should you require practical advice on the use of Elgood products, or wish to coat a trial area, please contact us FREE on 0800 393 779.
Floor Paint - Instructions
PREPARATION
- The floor should be clean and sound. Contamination such as dirt, dust, oil etc must be removed before coating the floor.
- Thorough cleaning of the floor with Elgood Heavy Duty Degreaser is recommended to remove surface contamination. Floor Paint should not be used on oil-saturated floors.
- Elgood Floor Paint requires minimal floor preparation, always paint a trial area to prove your preparation is adequate and that the paint is well adhered to the concrete.
PAINTING
- Remove any skin that may have formed on the surface of the paint.
- Stir the paint thoroughly before use.
- Pour some paint into a paint tray and apply using a long-handled roller.
- Apply the paint in thin coats. Do not allow the paint to puddle or leave excess paint on the floor.
- Two coat applications are best. The second coat should be applied 12 to 24 hours after the first coat.
- The floor should be ready for light traffic in 12 to 24 hours and normal traffic in 24 to 36 hours.
Should you require practical advice on the use of Elgood products, or wish to paint a trial area, please contact us FREE on 0800 393 779.
Terms and Conditions of Sale
- V.A.T.
All prices quoted are exclusive of value added tax. - Payment
Elgood Industrial Flooring shall invoice immediately after the products have been delivered. Payment shall be due within thirty days of the date of invoice. - Slip Resistance
Floorings are described as slip resistant when installed in clean, dry and uncontaminated conditions. The Employer/Client shall be responsible for ensuring that the flooring works provide a safe working surface in the prevailing working conditions immediately after completion of the flooring works and thereafter. It should be noted that the slip resistance of all surfaces will be reduced as the surface becomes contaminated or worn. - Colours
The initial colour and gloss of the flooring works will fade with normal industrial use. - Coverage Rates
The coverage rates provided by Elgood Industrial Flooring are given as a guide only. In practice, the texture and porosity of the concrete will produce varying rates of coverage. - Recommended Site Conditions
The building in which the works are to be carried out shall be fully enclosed and maintained (24 hours a day) at a temperature of not less that 10°C during the installation. - Structural Defects
E.I.F. shall not be held liable for any defect in the application of DIY flooring products which is due to structural, physical or chemical inadequacy in the building/s in which the products are laid.
![]()